A Generic Framework for Managing Schedule and Cost Risks of Construction Activities Using PERT and the EV Technique

地铁列车时刻表 系统工程 计算机科学 风险分析(工程) 工程类 可靠性工程 运筹学 建筑工程 业务 操作系统
作者
Essam Zaneldin,Waleed Ahmed
出处
期刊:Buildings [Multidisciplinary Digital Publishing Institute]
卷期号:14 (7): 1918-1918 被引量:4
标识
DOI:10.3390/buildings14071918
摘要

Construction projects are complexity, multidisciplinary, have thousands of activities and details, and involve many participants. This intricate and fragmented nature of construction projects coupled with tight budgets and limited resources makes them good candidates for failure and promotes the emergence of risks. These risks must be addressed in the decision-making process and properly managed to mitigate their effect. However, risk management is one of the most difficult tasks and the assessment and analysis of the cost and schedule risks of construction activities are considered the most challenging tasks in the whole risk management process and require careful considerations throughout the life cycle of a project. Despite the high cost associated with managing risk in construction projects, the outcome of this task normally provides fruitful benefits. To address this crucial issue, this study employs a mixed methodology approach utilizing both qualitative and quantitative methods to gather feedback from construction experts and identify schedule and cost risk events associated with construction activities, prioritize their likelihood of occurrence, and suggest responses to mitigate them. The Program Evaluation and Review Technique (PERT) and earned value (EV) analysis are then used to estimate the expected cost at completion and the risk associated with it. A spreadsheet framework is then developed to help construction practitioners identify the most severe risks and measure their effect on the project’s duration and cost. The framework also suggests risk responses for each of the risk events. The study then provides recommendations to mitigate risks with high impact and severity.
最长约 10秒,即可获得该文献文件

科研通智能强力驱动
Strongly Powered by AbleSci AI
更新
PDF的下载单位、IP信息已删除 (2025-6-4)

科研通是完全免费的文献互助平台,具备全网最快的应助速度,最高的求助完成率。 对每一个文献求助,科研通都将尽心尽力,给求助人一个满意的交代。
实时播报
1秒前
2秒前
Kirito应助guozizi采纳,获得30
2秒前
Ing完成签到,获得积分10
2秒前
3秒前
limin完成签到 ,获得积分10
4秒前
汐尘发布了新的文献求助10
6秒前
番茄发布了新的文献求助10
7秒前
10秒前
13秒前
limz完成签到,获得积分10
13秒前
15秒前
jenningseastera完成签到,获得积分0
15秒前
番茄完成签到,获得积分10
17秒前
123发布了新的文献求助10
18秒前
情怀应助Bailey采纳,获得10
19秒前
领导范儿应助277采纳,获得10
20秒前
20秒前
dreamode完成签到,获得积分10
21秒前
21秒前
猕猴桃砂糖完成签到,获得积分10
21秒前
23秒前
超体完成签到 ,获得积分10
25秒前
糖糖发布了新的文献求助10
25秒前
英俊的铭应助称心发夹采纳,获得10
29秒前
29秒前
yuyuyu完成签到,获得积分20
31秒前
甜美皮卡丘完成签到,获得积分10
34秒前
活力鸡完成签到 ,获得积分10
35秒前
chengjie完成签到,获得积分10
35秒前
yongyou发布了新的文献求助10
35秒前
忽而今夏发布了新的文献求助20
35秒前
沐沐完成签到 ,获得积分10
36秒前
桐桐应助博修采纳,获得10
36秒前
yuyuyu发布了新的文献求助10
36秒前
賢様666完成签到,获得积分10
40秒前
40秒前
41秒前
清新的易真完成签到,获得积分10
43秒前
炸炸呦应助ardejiang采纳,获得10
44秒前
高分求助中
【请各位用户详细阅读此贴后再求助】科研通的精品贴汇总(请勿应助) 10000
【提示信息,请勿应助】关于scihub 10000
Les Mantodea de Guyane: Insecta, Polyneoptera [The Mantids of French Guiana] 3000
徐淮辽南地区新元古代叠层石及生物地层 3000
The Mother of All Tableaux: Order, Equivalence, and Geometry in the Large-scale Structure of Optimality Theory 3000
Research on Disturbance Rejection Control Algorithm for Aerial Operation Robots 1000
Global Eyelash Assessment scale (GEA) 1000
热门求助领域 (近24小时)
化学 材料科学 医学 生物 工程类 有机化学 生物化学 物理 内科学 纳米技术 计算机科学 化学工程 复合材料 遗传学 基因 物理化学 催化作用 冶金 细胞生物学 免疫学
热门帖子
关注 科研通微信公众号,转发送积分 4046207
求助须知:如何正确求助?哪些是违规求助? 3583899
关于积分的说明 11391081
捐赠科研通 3311233
什么是DOI,文献DOI怎么找? 1822160
邀请新用户注册赠送积分活动 894381
科研通“疑难数据库(出版商)”最低求助积分说明 816213