水力发电
水力发电
淤积
淤泥
防洪
工业化
中国
繁荣
水资源管理
土木工程
大洪水
水文学(农业)
地理
环境科学
政治学
工程类
地质学
考古
沉积物
岩土工程
电气工程
法学
古生物学
标识
DOI:10.3197/096734019x15631846928729
摘要
Abstract Focusing on the planning and construction of the Sanmenxia hydropower project, this article analyses the dynamics and tensions between energy demand and the nature of the Yellow River in the twentieth century. From the late 1920s, Japanese engineers aimed to develop hydroelectric power by building dams on the Yellow River. They viewed the Yellow River as an important source of hydroelectric power for building the Greater East Asian Co-Prosperity Sphere. When Chinese Communists took control, they claimed that the primary function of the Sanmenxia project was flood control. Yet, influenced by the Soviet Union and the Chinese Communist state's industrialisation efforts, the engineers also emphasised the generation of electrical power, which resulted in a high dam design. The silting of the reservoir, however, frustrated the ambition of the Chinese leaders and engineers and resulted in the production of much lower and unstable power output upon the dam's completion.
科研通智能强力驱动
Strongly Powered by AbleSci AI