Lv31
310 积分 2026-03-20 加入
Conceptual Design of the EDIPO 2 Magnet
1个月前
已完结
Quench Detection for the Primary Windings of a 100-kA Superconducting Electric Transformer in the Conductor Performance Test Platform of the CRAFT
2个月前
已完结
Facility status and results on ITER full-size conductor tests in SULTAN
2个月前
已完结
Coupled Electromagnetic–Thermal Modeling of HTS Transformer Inrush Current: Experimental Validation and Thermal Analysis
2个月前
已完结
A 50 kA Superconducting Transformer for the Upcoming High-Field High-Current Testing Station at the BNL
2个月前
已完结
Testing of a 15 kA Superconducting Transformer
2个月前
已完结