Lv0
0 积分 2026-05-08 加入
Block Erection Sequencing in Shipbuilding With General Lifting and Joining Times
1个月前
已完结
Lean IHOP Transformation of Shipyard Erection Block Construction
1个月前
已完结
Block Erection in the Event of Delays in Shipbuilding: A Scenario-Based Approach
1个月前
已关闭
Handling uncertainty in the quay crane scheduling problem: a unified distributionally robust decision model
2个月前
已完结
The Three-Stage Integrated Optimization of Automated Container Terminal Scheduling Based on Improved Genetic Algorithm
2个月前
已完结
Multi-objective bacterial colony optimization algorithm for integrated container terminal scheduling problem
2个月前
已完结
Integrated scheduling of yard cranes, external trucks, and internal trucks in maritime container terminal operation
2个月前
已完结