Lv0
0 积分 2025-11-19 加入
Behavior of two new moment resisting precast beam to column connections subjected to lateral loading
21小时前
已完结
Beam-column joints in continuous RC frames: Comparison between cast-in-situ and precast solutions
21小时前
已完结
Nonlinear finite element analysis and modeling of a precast hybrid beam–column connection subjected to cyclic loads
22小时前
已完结
The effect of the diameter of prestressed strands providing the post-tensioned beam-to-column connections
22小时前
已完结
Seismic Tests of Beam-to-Column Connections in a Precast Concrete Frame
23小时前
已关闭
Design of Connections of Earthquake Resisting Precast Reinforced Concrete Perimeter Frames
23小时前
已关闭
Seismic Performance and Flexural Stiffness Variation of Assembled Precast High-Strength Concrete Beam Jointed at Mid-Span Using Transverse Bolts
23小时前
已关闭
Precast Concrete Members With Welded Plate Connections Under Reversed Cyclic Loading
23小时前
已完结
Seismic Response of Precast Prestressed Concrete Frames With Partially Debonded Tendons
23小时前
已完结