Lv11
30 积分 2025-04-24 加入
Subway station flood risk management level analysis
31分钟前
待确认
Model and numerical analyses of screw pile uplift in dry sand
1个月前
已完结
Laboratory Studies on Pressure Filtration in Post-Grouting of Drilled Shaft Tips in Clay
4个月前
已完结
Compaction Grouting
4个月前
已完结
Compaction Grouting Technique and Observations
4个月前
已完结
Cyclic direct shear behaviors of frozen soil–structure interface under constant normal stiffness condition
6个月前
已完结
Influence of freeze-thaw cycles on the shear performance of silty clay-concrete interface
6个月前
已完结