Structures and Settlement Control of Yujingshan High-Speed Railway Tunnel Crossing Massive Rockfill in a Giant Karst Cave

结算(财务) 岩土工程 发掘 工程类 洞穴 地质学
作者
Yipeng Xie,Junsheng Yang,Cong Zhang,Fu Junyi
出处
期刊:Transportation Research Record [SAGE Publishing]
卷期号:: 036119812110624-036119812110624
标识
DOI:10.1177/03611981211062484
摘要

The Yujingshan high-speed railway tunnel crosses a giant cavern system with a 108 × 10 4 m 3 volume chamber and an 18 km long underground river. The massive project, which lasted three years, was eventually awarded the “Overcoming the Challenges” award by the International Tunneling and Underground Space Association (ITA) in 2020. However, since the cave chamber was filled with large-scale rockfill, structural settlement is a non-negligible problem. This paper presents the unique structures of a bridge supporting railway tracks wrapped by tunnel lining and the settlement control of the Yujingshan tunnel crossing massive rockfill in the giant cave. The geological characteristics and design considerations are systematically introduced. A three-dimensional coupling discrete element method (DEM) and finite difference method (FDM) numerical model and 13 months of long-term settlement monitoring were conducted to evaluate the settlement behavior. The results indicate that the morphology of cavern and internal deposits caused the whole rockfill to migrate to the lower left. The tunnel structure consequently developed a significant inclined settlement. The continuous construction load would increase the settlement value by 31.4%. The bottom reinforcement of steel-pipe pile with grouting could effectively inhibit settlement and differential settlement. Considering the simulation results, the tunnel bottom had greater settlement than the limit standard for high-speed railway embankment, which means this special structure form is reasonable for operation. Meanwhile, the monitoring results show that the tunnel bottom settlement in D3K279+891~D3K279+947 had not performed an apparent convergence trend after 13 months. Further structural monitoring and compensation grouting should be actively considered for operation maintenance.

科研通智能强力驱动
Strongly Powered by AbleSci AI
科研通是完全免费的文献互助平台,具备全网最快的应助速度,最高的求助完成率。 对每一个文献求助,科研通都将尽心尽力,给求助人一个满意的交代。
实时播报
刚刚
1秒前
hxs606发布了新的文献求助10
1秒前
研友_nxVJ78发布了新的文献求助10
2秒前
3秒前
小雪完成签到,获得积分10
3秒前
科研通AI6.1应助shatang采纳,获得10
3秒前
lll应助科研通管家采纳,获得20
5秒前
科目三应助科研通管家采纳,获得10
5秒前
lll应助科研通管家采纳,获得20
5秒前
謃河鷺起完成签到,获得积分10
5秒前
桐桐应助科研通管家采纳,获得30
5秒前
酷波er应助科研通管家采纳,获得10
5秒前
5秒前
5秒前
李泽铭发布了新的文献求助10
6秒前
6秒前
Nicole完成签到,获得积分10
6秒前
Desserts发布了新的文献求助10
7秒前
SciGPT应助谦让的飞绿采纳,获得10
8秒前
兵王应助飞鸿影下采纳,获得10
9秒前
周一完成签到,获得积分10
9秒前
彭于晏应助汉堡采纳,获得10
9秒前
调皮的大雁完成签到,获得积分20
10秒前
简单若云发布了新的文献求助10
11秒前
12秒前
梁平完成签到,获得积分20
12秒前
周一发布了新的文献求助10
12秒前
樛木笑瑳完成签到,获得积分10
14秒前
14秒前
14秒前
14秒前
孙冲完成签到,获得积分10
15秒前
科研通AI6.3应助哦哦采纳,获得10
15秒前
15秒前
科研通AI6.2应助玉树临风采纳,获得10
15秒前
123发布了新的文献求助10
18秒前
赵雅芝完成签到,获得积分10
18秒前
19秒前
兵王应助Jubilant采纳,获得10
20秒前
高分求助中
Annie Ernaux: De la perte au corps glorieux 600
Petrology and Plate Tectonics,2025 500
A revision of Limenitis helmanni and its related species (Nymphalidae) from Central and South China 400
Moore's Clinically Oriented Anatomy 10th Edition 400
Direct and Iterative Linear System Solvers 400
Cardiopulmonary Bypass and Mechanical Support: Principles and Practice, Fifth Edition 400
Circular Polar Constellations Providing Continuous Single or Multiple Coverage Above a Specified Latitude 400
热门求助领域 (近24小时)
化学 材料科学 医学 生物 纳米技术 工程类 有机化学 化学工程 生物化学 计算机科学 物理 内科学 复合材料 催化作用 物理化学 光电子学 电极 细胞生物学 基因 无机化学
热门帖子
关注 科研通微信公众号,转发送积分 6771243
求助须知:如何正确求助?哪些是违规求助? 8495995
关于积分的说明 18103272
捐赠科研通 6064631
什么是DOI,文献DOI怎么找? 3014448
邀请新用户注册赠送积分活动 1991153
关于科研通互助平台的介绍 1970757