船员
机组调度
计算机科学
船员资源管理
调度(生产过程)
运筹学
缩小
作业车间调度
数学优化
任务(项目管理)
航空
工程类
航空学
地铁列车时刻表
系统工程
数学
操作系统
航空航天工程
程序设计语言
作者
Tianwei Zhou,Yu Xiao,Shiting Huang,D N Zheng,Wu Qiaoxuan
标识
DOI:10.1145/3635175.3635225
摘要
Crew resources are critical to airline operations. Efficient crew resource management can improve airline operation. The crew scheduling problem consists of two sub-problems: the crew pairing problem (CPP) and the crew rostering problem (CRP). This study focuses on the crew pairing problem (CPP), which is the most complex and important link in crew scheduling problem. To deal with this problem, a multi-base model is introduced into CPP, and a multi-objective model is established with minimization of the total number of flight loops and the task balance of multi-base flight loops. Three multi-objective optimization algorithms, awGA, NSGA-II and NAGA-III, are used to solve the model, and simulation results illustrate that NSGA-II obtained better results.
科研通智能强力驱动
Strongly Powered by AbleSci AI