Deformation Control of Subway Stations under the Influence of the Construction of Deep and Large Foundation Pits with Composite Support Systems

变形(气象学) 磁道(磁盘驱动器) 地铁站 变形监测 发掘 岩土工程 堆 基础(证据) 结算(财务) 全站仪 地质学 工程类 结构工程 大地测量学 计算机科学 机械工程 法学 万维网 付款 海洋学 运输工程 政治学
作者
Hua Peng,Qingchen Tang,Li Zhu,Zichen Li,Haiyang Li,Guangming Wang
出处
期刊:Applied sciences [Multidisciplinary Digital Publishing Institute]
卷期号:12 (6): 3026-3026
标识
DOI:10.3390/app12063026
摘要

The excavation depth of a deep and large foundation pit of a composite support system is 25.5 m, the minimum clear distance from the main structure of the station is 10.6 m and the closest distance to the entrance and exit structure is only 3.6 m. Relying on this project, numerical simulation, field monitoring and other methods are used to study the deformation law of the self-supporting system, the ground settlement and the subway station under construction. Then, the influence of different support parameters on the deformation of the subway station and track is analyzed, and the internal relationship between the deformation value of the station and track and the support parameters is further discussed. The main work and achievements are as follows: (1) Through field measurement and analysis, the deformation history of the station and track in the excavation is studied. The obtained results show that the interbracing + pile–anchor composite support structure has better control over the deformation of adjacent stations and tracks. Comparing the simulated value of station and track deformation with the measured data, it is concluded that the simulated and measured deformation trends remain consistent, and the maximum deformation value corresponds to the middle position of the foundation pit. This confirms the rationality and reliability of the composite support system model. (2) The analysis of the influence of different support parameters on the maximum deformation value of the subway station and track shows that the deformation of the station and track is less affected by the pile diameter of the retaining pile and the size of the interbracing section. It is greatly affected by the embedding depth of the retaining pile and the number of support channels. It is suggested that the optimal parameters should be a pile diameter of 1.0 m, embedding depth of 8 m, four interbracings and an interbracing section of 1.0 m × 1.0 m.

科研通智能强力驱动
Strongly Powered by AbleSci AI
科研通是完全免费的文献互助平台,具备全网最快的应助速度,最高的求助完成率。 对每一个文献求助,科研通都将尽心尽力,给求助人一个满意的交代。
实时播报
幽默的萍完成签到,获得积分10
1秒前
wawaeryu完成签到,获得积分0
2秒前
猫猫三完成签到,获得积分10
7秒前
lanlan完成签到 ,获得积分20
8秒前
MSY完成签到,获得积分10
9秒前
0飝0完成签到,获得积分10
13秒前
鱼鱼鱼鱼完成签到 ,获得积分10
14秒前
Hello的应助被稳重的秋天采纳,获得10
18秒前
旅行者N0501完成签到,获得积分10
19秒前
地兮完成签到 ,获得积分10
22秒前
池鱼完成签到,获得积分10
23秒前
任性吐司完成签到 ,获得积分10
24秒前
不吃葱花行不行完成签到 ,获得积分10
24秒前
葡萄小伊ovo完成签到 ,获得积分10
25秒前
如初完成签到,获得积分10
26秒前
核桃的应助被朱志伟采纳,获得30
26秒前
外向夜阑完成签到,获得积分10
30秒前
ccyy完成签到 ,获得积分10
30秒前
脑洞疼的应助被曾经的帅哥采纳,获得10
31秒前
坚强的绿萝完成签到 ,获得积分10
32秒前
肖之贤完成签到,获得积分10
36秒前
HaHaHa完成签到,获得积分10
36秒前
吃饭打肯德基完成签到 ,获得积分10
37秒前
无花果的应助被曾经的帅哥采纳,获得10
44秒前
缥缈洋葱完成签到 ,获得积分10
49秒前
怡然猎豹完成签到,获得积分0
50秒前
Yuan_2458完成签到 ,获得积分10
50秒前
高贵烧鹅完成签到,获得积分10
51秒前
58秒前
1分钟前
含糊的千琴完成签到,获得积分10
1分钟前
1分钟前
1分钟前
悦耳睿渊发布了新的文献求助10
1分钟前
路人甲完成签到 ,获得积分10
1分钟前
lilac发布了新的文献求助10
1分钟前
活力尔柳完成签到 ,获得积分10
1分钟前
1分钟前
Chris完成签到,获得积分10
1分钟前
byron完成签到 ,获得积分10
1分钟前
高分求助中
(应助此贴封号)【重要!!请各用户(尤其是新用户)详细阅读】【科研通的精品贴汇总】 10000
Rosenblum, Global Change Biology 800
自動車の空力技術 800
Organizational Behavior 510
Management and the Arts 510
Issues in Task-Based Language Teaching 500
Geschichtliche Grundbegriffe (GGB), Band 5: Pro–Soz 300
热门求助领域 (近24小时)
化学 材料科学 医学 生物 纳米技术 计算机科学 化学工程 工程类 有机化学 物理 复合材料 生物化学 内科学 细胞生物学 基因 遗传学 免疫学 冶金 光电子学 癌症研究
热门帖子
关注 科研通微信公众号,转发送积分 7785536
求助须知:如何正确求助?哪些是违规求助? 9324453
关于积分的说明 20398816
捐赠科研通 7374136
什么是DOI,文献DOI怎么找? 3321380
关于科研通互助平台的介绍 2469435
邀请新用户注册赠送积分活动 2337788