光伏系统
尺寸
时间范围
发电
独立电源系统
储能
网格
变压器
电
分布式发电
光伏并网发电系统
发电成本
安装
可靠性工程
工程类
电压
汽车工程
环境经济学
电气工程
数学优化
功率(物理)
可再生能源
光伏
经济
最大功率点跟踪
数学
艺术
视觉艺术
物理
机械工程
量子力学
逆变器
几何学
作者
Rahul Gupta,Fabrizio Sossan
出处
期刊:Applied Energy
[Elsevier BV]
日期:2023-03-21
卷期号:339: 120955-120955
被引量:30
标识
DOI:10.1016/j.apenergy.2023.120955
摘要
This work proposes a method for optimal planning (sizing and siting) energy storage systems (ESSs) in power distribution grids while considering the option of curtailing photo-voltaic (PV) generation. More specifically, for a given PV generation capacity to install, this method evaluates whether curtailing PV generation might be more economical than installing ESS. Indeed, while curtailing excess PV generation might be considered a last resort to avoid grid violations during operations, it is typically neglected in the planning phase. The proposed method accounts for the constraints of the power grid (i.e., nodal voltages, lines, and substation transformer limits) modeled by linearized power flow equations to keep the problem formulation tractable. The planning problem minimizes the net investment costs of the ESSs, and the imported and exported electricity costs considering a planning horizon of 20 years. The results are presented for a medium voltage (MV) distribution grid with different levels of installed capacity of PV generation, reflecting future scenarios of PV generation development. The sensitivity of the ESSs' sizes and investment costs to the electricity prices accounting for variable levels of PV production in the global generation mix is also investigated.
科研通智能强力驱动
Strongly Powered by AbleSci AI