可靠性工程
预测性维护
状态维修
预防性维护
计划维护
期限(时间)
纠正性维护
主动维护
风险分析(工程)
工程类
计算机科学
运营管理
业务
量子力学
物理
作者
Hang Yang,Zhe Zhang,Xianggen Yin,Jiexiang Han,Yong Wang,Guoyan Chen
出处
期刊:Energies
[Multidisciplinary Digital Publishing Institute]
日期:2017-11-14
卷期号:10 (11): 1865-1865
被引量:6
摘要
Current studies on preventive condition-based maintenance of power transmission and transformation equipment mainly focus on mid-term or long-term maintenance, and cannot meet the requirements of short-term especially temporary maintenance. In order to solve the defects of the present preventive maintenance strategies, according to the engineering application and based on risk-cost analysis, a short-term maintenance strategy is proposed in this manuscript. For the equipment working in bad health condition, its active maintenance costs and operation risk costs are evaluated, respectively. Then the latest maintenance time is calculated in accordance with the principle that its operation risk costs are no higher than active maintenance costs. Utilizing the latest maintenance time, the best maintenance time is calculated by setting the maximum relative earnings of postponing maintenance as the target, which provides the operation staffs with comprehensive maintenance-decision support. In the end, different cases on the IEEE 24-bus system are simulated. The effectiveness and advantages of the proposed strategy are demonstrated by the simulation results.
科研通智能强力驱动
Strongly Powered by AbleSci AI