Lv1
30 积分 2024-05-11 加入
Research on the Fatigue Reliability of a Catenary Support Structure Under High-Speed Train Operation Conditions
5天前
已完结
Full Scale Experiment for Vibration Analysis of Ice-Coated Bundled-Conductor Transmission Lines
6天前
已完结
Dynamic Response of Transmission Tower-Line Systems Due to Ground Vibration Caused by High-Speed Trains
6天前
已完结
Experimental study on the bearing capacity and fatigue life of lightning rod structure joints in high-voltage substation structures
6天前
已关闭
Fracture failure analysis of a lightning rod on a substation frame considering residual thermal stress
6天前
已完结
Wind-induced response prediction of coupled towers and lines of a transmission tower-line system based on an LSTM network
6天前
已完结
Choosing relaxation parameter in randomized Kaczmarz method
9个月前
已完结
$rm K$-SVD: An Algorithm for Designing Overcomplete Dictionaries for Sparse Representation
10个月前
已完结
STUDY ON DIFFERENT BEAM MODELS IN MOVING FORCE IDENTIFICATION
10个月前
已完结