Lv2
126 积分 2025-11-26 加入
Joint optimisation for dynamic flexible job-shop scheduling problem with transportation time and resource constraints
12天前
已完结
A simple metaheuristic approach to the simultaneous scheduling of machines and automated guided vehicles
12天前
已完结
A hybrid GA/heuristic approach to the simultaneous scheduling of machines and automated guided vehicles
12天前
已完结
A Novel Mathematical Model for the Flexible Job-Shop Scheduling Problem With Limited Automated Guided Vehicles
12天前
已完结
Simultaneous Scheduling of Processing Machines and Automated Guided Vehicles via a Multi-View Modeling-Based Hybrid Algorithm
12天前
已完结
Deep reinforcement learning-based memetic algorithm for energy-aware flexible job shop scheduling with multi-AGV
12天前
已完结
A dual population collaborative genetic algorithm for solving flexible job shop scheduling problem with AGV
12天前
已完结
Flexible job-shop scheduling with transportation resources
12天前
已完结
An improved genetic algorithm with modified critical path-based searching for integrated process planning and scheduling problem considering automated guided vehicle transportation task
12天前
已完结
Research on flexible job shop scheduling problem with AGV using double DQN
12天前
已完结