Lv1
30 积分 2024-01-06 加入
A visual digital twin framework based on residual-based fourier neural operator online simulation method
4个月前
已完结
Conflict-free scheduling of large-scale multi-load AGVs in material transportation network
5个月前
已完结
Meta-path-based Graph Reinforcement Learning Framework for Flexible Job Shop Scheduling Problem with Limited Mobile Robots
5个月前
已完结
Sustainable scheduling for a flexible job shop considering batch processing and batch transportation strategies
5个月前
已完结
Dual-Resource constrained flexible job-shop scheduling with ergonomic considerations in conventional and human-robot systems using an enhanced NSGA-II with teaching-learning effect
5个月前
已完结
Approach to Integrated Scheduling Problems Considering Optimal Number of Automated Guided Vehicles and Conflict-Free Routing in Flexible Manufacturing Systems
6个月前
已完结
Flexible job-shop scheduling with transportation resources
6个月前
已完结
Multi-objective optimization Model for Flexible Job Shop Scheduling Problem Considering Transportation Constraints: A Comparative Study
7个月前
已完结
Research on joint scheduling of AGVs and machines in multi-objective flexible job shop based on ISSA
8个月前
已完结
A dual population collaborative genetic algorithm for solving flexible job shop scheduling problem with AGV
8个月前
已完结