Lv11
70 积分 2024-01-06 加入
Approach to Integrated Scheduling Problems Considering Optimal Number of Automated Guided Vehicles and Conflict-Free Routing in Flexible Manufacturing Systems
3天前
已完结
Flexible job-shop scheduling with transportation resources
4天前
已完结
Multi-objective optimization Model for Flexible Job Shop Scheduling Problem Considering Transportation Constraints: A Comparative Study
1个月前
已完结
Research on joint scheduling of AGVs and machines in multi-objective flexible job shop based on ISSA
2个月前
已完结
A dual population collaborative genetic algorithm for solving flexible job shop scheduling problem with AGV
2个月前
已完结
An improved multi-objective evolutionary algorithm for the low-carbon flexible job shop scheduling with automated guided vehicles
2个月前
已完结
Integrated optimization of dynamic flexible job shop scheduling with AGV breakdowns and multi-site equipment maintenance on the demand side
2个月前
已完结
A reinforcement learning-based two-stage NSGA-II for dynamic flexible job shop scheduling problem with transportation constraints considering participators’ perception
2个月前
已完结
An integrated optimization method for multi-load AGVs and FJSP production scheduling based on DDQN-MCTS hybrid algorithm
2个月前
已完结
Integrated task assignment and path planning for Collision-Minimizing multiple Automated guided vehicles scheduling
2个月前
已完结