Lv51
1420 积分 2024-08-16 加入
Lateral loading behaviour of vibro-driven and impact-hammered monopiles installed in sand in a geotechnical centrifuge
2个月前
已完结
Development of a mini vibro-driver for pile testing in the centrifuge
4个月前
已完结
Effect of the installation process on monopile lateral response
4个月前
已完结
Wave Equation Analysis of a Vibratory Hammer-Driven Pile
5个月前
已完结
Wave Equation Analysis of a Vibratory Hammer-Driven Pile
5个月前
已关闭
Pile-Driving Analysis by the Wave Equation
5个月前
已完结
Influence of Specimen Preparation on the Liquefaction Behaviors of Sand and Its Mesoscopic Explanation
5个月前
已完结
Long-Term Response of Piles to Cyclic Lateral Loading Following Vibratory and Impact Driving in Water-Saturated Sand
5个月前
已关闭
Prediction and Monitoring of Installation of Offshore Foundation Monopiles for Windfarms
6个月前
已完结
Prediction and Monitoring of Installation of Offshore Foundation Monopiles for Windfarms
6个月前
已关闭