Lv41
794 积分 2025-11-05 加入
Prediction of the efficiency of production systems without internal storage
19天前
已关闭
A deep Q-network enhanced variable neighborhood search algorithm based on NSGA-II for the multi-AGV flexible job shop scheduling problem with battery constraint
1个月前
已关闭
Cloud-edge-end-based aircraft assembly production quality monitoring system framework and applications
2个月前
已完结
Ride Quality in Transonic High-Aspect-Ratio-Wing Aircraft
2个月前
已关闭
A data-driven approach for reliability assessment and remaining life prediction of aero-engines based on a time-transformed bivariate Wiener Process and Copula dependency structure
2个月前
已关闭
A novel MILP model for job shop scheduling problem with mobile robots
2个月前
已完结
Production-logistics cooperative scheduling in a two-stage assembly flow-shop with deteriorating robotic arm: a problem-specific heuristic
2个月前
已完结
Production-logistics cooperative scheduling in a two-stage assembly flow-shop with deteriorating robotic arm: a problem-specific heuristic
2个月前
已关闭
Integrated scheduling of multi-objective lot-streaming hybrid flowshop with AGV based on deep reinforcement learning
6个月前
已完结
Research on flexible job shop scheduling problem with AGV using double DQN
6个月前
已完结