Lv5
990 积分 2024-10-12 加入
A structural optimization method for floating dock gates based on an improved particle swarm–simulated annealing algorithm
1天前
待确认
Multi-objective energy-efficient scheduling of distributed heterogeneous hybrid flow shops via multi-agent double deep Q-Network
2个月前
已完结
Independent double DQN-based multi-agent reinforcement learning approach for online two-stage hybrid flow shop scheduling with batch machines
2个月前
已完结
A decomposition-based multi-objective evolutionary algorithm for hybrid flowshop rescheduling problem with consistent sublots
2个月前
已完结
A Q-learning-assisted memetic algorithm for joint vehicle scheduling problem for harvesting and transportation in smart agriculture
2个月前
已完结
Integrated scheduling of multi-objective lot-streaming hybrid flowshop with AGV based on deep reinforcement learning
2个月前
已完结
Two-stage hybrid flow shop batching and lot streaming with variable sublots and sequence-dependent setups
2个月前
已完结
A Hybrid Genetic Algorithm for Flexible Job Shop Scheduling Problem with Batch Processing Machines
2个月前
已完结
Energy-Efficient Iterative Greedy Algorithm for the Distributed Hybrid Flow Shop Scheduling With Blocking Constraints
2个月前
已完结
Efficient multi-objective meta-heuristic algorithms for energy-aware non-permutation flow-shop scheduling problem
2个月前
已完结