Lv11
40 积分 2025-08-12 加入
Discrete parallel machine makespan ScheLoc problem
11小时前
待确认
Post-disaster recovery sequencing strategy for road networks
14天前
已完结
A Branch-and-Price Algorithm for the Bilevel Network Maintenance Scheduling Problem
14天前
已完结
Novel Formulations and Logic-Based Benders Decomposition for the Integrated Parallel Machine Scheduling and Location Problem
15天前
已完结
Joint capacity planning and dynamic allocation for container leasing with asymmetric substitution
21天前
已完结
A New Exact Algorithm for Single-Commodity Vehicle Routing with Split Pickups and Deliveries
29天前
已完结
On the utilization of dedicated bus lanes for pooled ride-hailing services
3个月前
已完结
An Improved Exact $\varepsilon$-Constraint and Cut-and-Solve Combined Method for Biobjective Robust Lane Reservation
3个月前
已完结
A bi-level programming model for the optimal lane reservation problem
4个月前
已完结
Resource-Constrained Emergency Scheduling for Forest Fires via Artificial Bee Colony and Variable Neighborhood Search Combined Algorithm
4个月前
已完结