Lv1
30 积分 2024-09-19 加入
The top 10 universal delay factors in construction projects
1个月前
已完结
Global BIM-point cloud registration and association for construction progress monitoring
1个月前
已关闭
The DEMATEL-ISM Analysis on Influence Factors of Economic Operation of Wind Power Projects
1个月前
已关闭
A Simulation-Based Scheduling Methodology for Construction Projects Considering the Potential Impacts of Delay Risks
1个月前
已完结
Schedule-cost optimization in high-rise buildings considering uncertainty
1个月前
已完结
Risk Assessment of Highway Infrastructure REITs Projects Based on the DEMATEL—ISM Approach
1个月前
已完结
Research on influencing factors of coal mine safety production based on integrated fuzzy DEMATEL-ISM methods
1个月前
已完结
What is the driving mechanism for the carbon emissions in the building sector? An integrated DEMATEL-ISM model
1个月前
已完结