Lv51
1050 积分 2022-03-04 加入
Preemptive multi-skill resource-constrained project scheduling of marine power equipment maintenance tasks1
1小时前
已完结
A Q‐Learning‐based method applied to stochastic resource constrained project scheduling with new project arrivals
1个月前
已完结
Maximizing robustness of aircraft routing with heterogeneous maintenance tasks
1个月前
已完结
Lexicographic bi-objective scheduling under budget constraints in distributed production-transportation-assembly systems
1个月前
已完结
Balancing U-shaped assembly lines with collaborative robots: constraint programming approaches and Benders’ decomposition algorithms
1个月前
已完结
Modelling and optimisation of energy-efficient U-shaped robotic assembly line balancing problems
1个月前
已完结
End-to-end underwater acoustic transmission loss prediction with adaptive multi-scale dilated network
2个月前
已完结
Predicting transmission loss in underwater acoustics using continual learning with range-dependent conditional convolutional neural networks
2个月前
已关闭
Decision support for the integrated flexible job shop scheduling and operator timetabling problem
2个月前
已完结
A matheuristic and imitation learning-driven evolutionary algorithm for the flexible job shop scheduling benchmark problem with discrete operation sequence flexibility
2个月前
已完结