Lv3
220 积分 2025-10-14 加入
A double-Q network collaborative multi-objective optimization algorithm for precast scheduling with curing constraints
5个月前
已完结
Scheduling distributed heterogeneous parallel precast flowshop with shared resources via logic-based Benders decomposition
5个月前
已完结
Energy-aware production scheduling in the flow shop environment under sequence-dependent setup times, group scheduling and renewable energy constraints
9个月前
已完结
Energy-aware production scheduling in the flow shop environment under sequence-dependent setup times, group scheduling and renewable energy constraints
9个月前
已关闭
An Improved Model for Precast Component Transportation Scheduling under Dynamic Traffic and Weather Conditions
9个月前
已完结
An Improved Model for Precast Component Transportation Scheduling under Dynamic Traffic and Weather Conditions
9个月前
已完结
Robust Optimization for Precast Component Production Scheduling Considering Component Transfer
9个月前
已完结
Hybrid rescheduling optimization model under disruptions in precast production considering real-world environment
10个月前
已完结