夏至
SciHub
文献互助
期刊查询
一搜即达
科研导航
即时热点
交流社区
登录
注册
发布
文献
求助
首页
我的求助
捐赠本站
已入深夜,您辛苦了!由于当前在线用户较少,发布求助请尽量完整地填写文献信息,科研通机器人24小时在线,伴您度过漫漫科研夜!祝你早点完成任务,早点休息,好梦!
球球
Lv1
1
36 积分
2024-12-20 加入
最近求助
最近应助
互助留言
An improved multi-population genetic algorithm with a greedy job insertion inter-factory neighborhood structure for distributed heterogeneous hybrid flow shop scheduling problem
5小时前
已完结
A self-learning hyper-heuristic for the distributed assembly blocking flow shop scheduling problem with total flowtime criterion
5小时前
待确认
The Diffusion of New Technologies
24天前
已完结
EFJSP-IBDR: Energy-efficient flexible job shop scheduling under incentive-based demand response via graph reinforcement learning with dual attention mechanism
2个月前
已完结
Combining meta-heuristics and Q-learning for scheduling lot-streaming hybrid flow shops with consistent sublots
4个月前
已完结
Modelling and scheduling distributed assembly permutation flow-shops using reinforcement learning-based evolutionary algorithms
4个月前
已完结
Combining meta-heuristics and Q-learning for scheduling lot-streaming hybrid flow shops with consistent sublots
4个月前
已完结
Modelling and scheduling distributed assembly permutation flow-shops using reinforcement learning-based evolutionary algorithms
4个月前
已完结
Double-Learning-Strategy-Based Evolutionary Algorithm for Scheduling Multiobjective Distributed Assembly Permutation Flowshops With Setup Time
4个月前
已完结
Mechanical properties and durability of rubberized and SBR latex modified rubberized concrete
5个月前
已完结
没有进行任何应助
感谢
5小时前
最近帖子
最近评论
没有发布任何帖子
没有发布任何评论