Lv12
84 积分 2025-01-04 加入
Research on bilateral assembly line optimization for man-robot collaboration based on multi-objective migration bird optimization algorithm
1天前
已完结
Rescheduling optimisation of sustainable multi-objective fuzzy flexible job shop under uncertain environment
7天前
已完结
Flexible job shop scheduling with stochastic machine breakdowns by an improved tuna swarm optimization algorithm
7天前
已完结
A Multi-Type data driven framework for solving flexible job shop scheduling problem considering multiple production resource states
7天前
已完结
Multi-objective flexible flow-shop rescheduling with rigid-flexible hybrid constraints and preventive maintenance
7天前
已完结
Efficient scheduling for fixed-type multi-robot collaborative problem in flexible job shop
7天前
已完结
Model and metaheuristic for human-robot collaboration assembly line worker assignment and balancing problem
7天前
已完结
New approaches for rebalancing an assembly line with disruptions
7天前
已完结
Rebalancing the assembly lines with total squared workload and total replacement distance objectives
7天前
已完结
An integrated model for assembly line re-balancing problem
7天前
已完结