Lv5
990 积分 2024-12-27 加入
基于机器学习算法的土岩复合地层深基坑变形时序预测
4个月前
已完结
Evaluation of deformation for two-dimensional (2D) and three-dimensional (3D) braced excavation in clays with centrifuge modelling and numerical analysis
5个月前
已完结
Performance of an asymmetric pit-in-pit excavation supported by diaphragm wall and multi uplift piles system in coastal areas
5个月前
已完结
Performance of an asymmetric pit-in-pit excavation supported by diaphragm wall and multi uplift piles system in coastal areas
5个月前
已关闭
Settlement of deep footings in reconstituted sand
5个月前
已完结
Evaluation of deformation for two-dimensional (2D) and three-dimensional (3D) braced excavation in clays with centrifuge modelling and numerical analysis
5个月前
已关闭
A numerical study of deep excavations adjacent to existing tunnels: integrating CPTU and SDMT to calibrate soil constitutive model
5个月前
已完结
Analyse tridimensionnelle de la stabilité faciale de tunnels circulaires jumeaux dans un sol à double couche
6个月前
已关闭
Face stability of karst tunnels considering drag force of connected fracture based on limit analysis
7个月前
已完结
Face stability of karst tunnels consideringdrag force of connected fracture based onlimit analysis
7个月前
已关闭