Lv4
416 积分 2025-05-28 加入
Solving bi-objective integrated scheduling problem of production, inventory and distribution using a modified NSGA-II
1个月前
已完结
Application of hybrid artificial bee colony algorithm based on load balancing in aerospace composite material manufacturing
1个月前
已完结
An integrated scheduling approach considering dispatching strategy and conflict-free route of AMRs in flexible job shop
1个月前
已完结
A green multi-objective integrated scheduling of production and distribution with heterogeneous fleet vehicle routing and time windows
1个月前
已完结
Multi-objective teaching–learning-based optimization algorithm for carbon-efficient integrated scheduling of distributed production and distribution considering shared transportation resource
1个月前
已完结
Solving bi-objective integrated scheduling problem of production, inventory and distribution using a modified NSGA-II
1个月前
已完结
A cooperative evolutionary algorithm with simulated annealing for integrated scheduling of distributed flexible job shops and distribution
1个月前
已完结
Deep reinforcement learning based AGVs real-time scheduling with mixed rule for flexible shop floor in industry 4.0
1个月前
已完结
Multi-resource collaborative scheduling problem of automated terminal considering the AGV charging effect under COVID-19
1个月前
已完结