Lv1
72 积分 2025-07-29 加入
A Two-Phase Iterative Heuristic Approach for the Production Routing Problem
18天前
已完结
Coordinating Aggregate and Detailed Scheduling in the One-Machine Job Shop: II—Computation and Structure
23天前
已完结
The job shop scheduling problem with convex costs
1个月前
已完结
Branch-and-Cut-and-Price for the Vehicle Routing Problem with Time Windows and Convex Node Costs
1个月前
已完结
A critical-path based iterated local search for the green permutation flowshop problem
1个月前
已关闭
The constrained permutation flowshop problem: An effective two-stage iterated greedy algorithm to minimize weighted tardiness
1个月前
已完结
A heuristic algorithm for the m-machine, n-job flow-shop sequencing problem
1个月前
已完结
Comparative evaluation of MILP flowshop models
1个月前
已完结
MILP-based local search procedures for minimizing total tardiness in the No-idle Permutation Flowshop Problem
1个月前
已关闭
The application of heterogeneous graph neural network and deep reinforcement learning in hybrid flow shop scheduling problem
2个月前
已完结