Lv1
50 积分 2025-11-26 加入
On Maximizing the Net Present Value of a Project Under Renewable Resource Constraints
7天前
已完结
Two-Stage Robust Optimization With Decision Dependent Uncertainty
2个月前
已完结
Two-Stage Robust Optimization Under Decision Dependent Uncertainty
2个月前
已完结
Flow shop scheduling with human-robot collaboration: a joint chance-constrained programming approach
3个月前
已完结
Multi-objective human–robot collaborative two-sided assembly line balancing problem with the optimization of ergonomics and energy consumption
3个月前
已完结
Enhancing scalable reconfigurable manufacturing systems through robust optimisation: energy efficiency and cost minimisation under uncertainty
3个月前
已完结
Multi-mode resource-constrained project scheduling problem with multiple shifts and dynamic energy prices
3个月前
已完结
A two-stage robust optimization and material ordering under model for multi-project scheduling demand uncertainty
4个月前
已完结
Critical-Path-Search Logic-Based Benders Decomposition Approaches for Flexible Job Shop Scheduling
4个月前
已完结
Robustness and Approximation for Universal Sequencing
5个月前
已完结