Lv11
44 积分 2025-01-12 加入
Modified Distance Calculation in Generational Distance and Inverted Generational Distance
3小时前
已完结
A variable neighbourhood search for hybrid flow-shop scheduling problem with rework and set-up times
4小时前
已完结
A survey of scheduling problems with setup times or costs
4小时前
已完结
A variable neighbourhood search for hybrid flow-shop scheduling problem with rework and set-up times
4小时前
已关闭
The dual-resource-constrained re-entrant flexible flow shop a constraint programming approach and a hybrid genetic algorithm
1个月前
已完结
Deep reinforcement learning for solving hybrid flow shop scheduling problems with limited buffers
1个月前
已完结
Hierarchical Diffusion Teaching-Learning-Based Optimizer with Variational Autoencoder for Mobile Edge Computing System Optimization
5个月前
已完结
A Diversity-Enhanced Evolutionary Algorithm with Auxiliary Decomposition for Many-Objective Slab Allocation in Steel Production
5个月前
已关闭
A novel collaborative iterative greedy algorithm for hybrid flowshop scheduling problem with batch processing machines and variable sublots
5个月前
已完结
The dual-resource-constrained re-entrant flexible flow shop a constraint programming approach and a hybrid genetic algorithm
5个月前
已完结