Lv51
1350 积分 2023-10-27 加入
Autoclave molding scheduling in aerospace composite materials production using an extended whale optimization algorithm
2个月前
已完结
Decision-making model of machine tool remanufacturing alternatives based on dual interval rough number clouds
2个月前
已完结
Evaluating the Current Situation of River and Lake Shoreline Planning and Utilization Using an Improved Matter-Element Extension Model
2个月前
已完结
A hyper-heuristic algorithm via proximal policy optimization for multi-objective truss problems
8个月前
已完结
A reinforcement learning hyper-heuristic algorithm for the distributed flowshops scheduling problem under consideration of emergency order insertion
8个月前
已完结
MEDHEA: Multidimensional estimation of distribution based hyper-heuristic evolutionary algorithm for energy-efficient distributed assembly no-wait flow-shop scheduling problem
8个月前
已完结
A novel hyper-heuristic based on surrogate genetic programming for the three-dimensional spatial resource-constrained project scheduling problem under uncertain environments
8个月前
已完结
Learn to optimise for job shop scheduling: a survey with comparison between genetic programming and reinforcement learning
8个月前
已完结
Federated deep reinforcement learning for dynamic job scheduling in cloud-edge collaborative manufacturing systems
8个月前
已完结
Collaborative optimization for scheduling manufacturing tasks and transport vehicles considering manufacturer’s time availability in cloud manufacturing
8个月前
已完结