Lv5
1557 积分 2025-04-09 加入
Improved algorithm for minimizing total late work on a proportionate flow shop and extensions to job rejection and generalized due dates
1个月前
已关闭
Proportionate flow shop: New complexity results and models with due date assignment
1个月前
已完结
On equivalence between the proportionate flow shop and single‐machine scheduling problems
1个月前
已完结
Dynamic Programming for Proportionate Flow-Shop Scheduling with Due-Date Assignment
3个月前
已完结
The Two Single-Machine Scheduling Problems with Slack Due Date to Minimize Total Early Work and Late Work
3个月前
已完结
基于改进CBS算法的多AGV路径规划
3个月前
已完结
AGV path planning algorithm based on improved Dijkstra algorithm
3个月前
已完结
Proportionate Flow Shop Scheduling with Two Competing Agents to Minimize Weighted Late Work and Weighted Number of Late Jobs
3个月前
已完结
Minimizing Total Weighted Late Work in a Proportionate Flow Shop with Job Rejection
3个月前
已完结
Minimizing Total Tardiness on One Machine is NP-Hard
4个月前
已完结