Lv2
160 积分 2023-09-14 加入
Application and design method of dredging sludge ground treated via prefabricated radiant drain vacuum preloading
1年前
已完结
Experimental study on dredged slurry treatment with straw as horizonal drains by vacuum preloading
1年前
已完结
Behavior of Laterally Loaded Piles: I-Single Piles
1年前
已完结
Digital Image Finite Element Analysis of Geotechnical Engineering Materials
1年前
已完结
Rapid treatment of high-water-content dredged slurry using composite flocculant and PHD-facilitated vacuum
1年前
已完结
Application and design method of dredging sludge ground treated via prefabricated radiant drain vacuum preloading
1年前
已完结
Predicting the compaction parameters of solidified dredged fine sediments with statistical approach
2年前
已完结