Lv4
760 积分 2024-10-21 加入
Order selection and fulfillment integration with flexible products
1个月前
已关闭
Integrated scheduling optimization of production and transportation for precast component with delivery time window
2个月前
已完结
Adaptive genetic algorithm for two-stage hybrid flow-shop scheduling with sequence-independent setup time and no-interruption requirement
2个月前
已完结
Scheduling with sequence-dependent setup times in short-term production planning: A main path analysis-based review
2个月前
已完结
Integrated production and transportation scheduling problem under nonlinear cost structures
4个月前
已完结
New exact and approximation algorithms for integrated production and transportation scheduling with committed delivery due dates and order acceptance
4个月前
已关闭
A tabu-based adaptive large neighborhood search for scheduling unrelated parallel batch processing machines with non-identical job sizes and dynamic job arrivals
4个月前
已完结
Self-adaptive General Variable Neighborhood Search algorithm for parallel machine scheduling with unrelated servers
4个月前
已关闭
Scheduling problems on parallel machines with machine-dependent generalized due-dates
4个月前
已完结
Exact MILP Models for Redundancy Allocation with Mixed Components
5个月前
已完结