Lv44
636 积分 2026-03-16 加入
An effective iterative greedy algorithm for distributed blocking flowshop scheduling problem with balanced energy costs criterion
20分钟前
待确认
Novel CP Models and CP-Assisted Meta-Heuristic Algorithm for Flexible Job Shop Scheduling Benchmark Problem With Multi-AGV
1个月前
已完结
Multimodal Multi-Objective Flexible Job Shop Scheduling: A Preliminary Study
1个月前
已完结
Microstructure evolution of HfB2-SiC/SiC coating for C/C composites during long-term oxidation at 1700°C
1个月前
已完结
Microstructure evolution of HfB2-SiC/SiC coating for C/C composites during long-term oxidation at 1700 °C
1个月前
已完结
Functionally Graded Oxide Scale on (Hf,Zr,Ti)B2 Coating with Exceptional Ablation Resistance Induced by Unique Ti Dissolving
4个月前
已完结
A hybrid artificial bee colony algorithm for a flexible job shop scheduling problem with overlapping in operations
6个月前
已完结
Hybrid Gaussian quantum particle swarm optimization and adaptive genetic algorithm for flexible job-shop scheduling problem
7个月前
已完结
A Novel Mathematical Model for the Flexible Job-Shop Scheduling Problem With Limited Automated Guided Vehicles
8个月前
已完结
A hybrid NSGA-II for energy-efficient flexible job shop scheduling problem with finite multi-load AGV resources
8个月前
已完结