Lv33
310 积分 2024-08-19 加入
Smart “Predict, then Optimize”
21天前
已完结
Single Machine Lot Scheduling to Minimize Maximum Weighted Completion Time
1个月前
已完结
Lot scheduling to minimize makespan in permutation flowshop
1个月前
已完结
Integrated Production and Transportation Financial Supply Chain Scheduling via a Q‐Learning‐Based Heuristic Method
1个月前
已完结
Lot Scheduling: Review
1个月前
已完结
Single machine lot scheduling to minimize maximum weighted completion time
1个月前
已完结
Mathematical Models and Optimal Algorithms for Lot Scheduling Considering Job Splitting and Due Dates in Green Logistics
2个月前
已完结
Single-machine scheduling with the learning effect of processing time and the deterioration effect of delivery time for prefabricated components
3个月前
已完结
Influential factors and passenger satisfaction towards integrated urban-rural bus services: A case study of Chibi, China
9个月前
已完结
Dynamic Confirmation, Compensation and Routing for Combined Urban Transportation of Passengers and Parcels
9个月前
已完结