Lv3
270 积分 2026-03-13 加入
Experimental Study of Pre-Tensioned Polygonal Prestressed T-Beam Under Combined Loading Condition
19天前
已完结
Experiment and Numerical Study on the Flexural Behavior of a 30 m Pre-Tensioned Concrete T-Beam with Polygonal Tendons
19天前
已完结
Full-Scale Experimental Research on Diagonal Crack Resistance of 30 m Pretensioned Polygonal Prestressed T-Beams
19天前
已完结
Composite Performance of Prestressed Hollow-Core Slabs with Cast-in-Place Topping Concrete
3个月前
已完结
Digital twins-boosted intelligent maintenance of ageing bridge hangers exposed to coupled corrosion–fatigue deterioration
3个月前
已完结
AIoT-informed digital twin communication for bridge maintenance
3个月前
已关闭
Development of corrosion-fatigue analysis method of cable hangers in tied-arch bridges considering train-bridge interaction
3个月前
已完结
Wind-induced fatigue life prediction of bridge hangers considering the effect of wind direction
3个月前
已完结
Deep learning-driven multi-level data fusion framework for predictive maintenance and structural health monitoring of concrete bridge decks
3个月前
已完结