Lv3
385 积分 2023-02-06 加入
Nonexistence of a 2‐(196,6,1) Design With a Point‐Transitive Automorphism Group
1天前
已完结
Parallel Machine Scheduling Under Uncertainty: Models and Exact Algorithms
1个月前
已完结
The Anchor-Robust Project Scheduling Problem
1个月前
已完结
Distributionally Robust Optimization Under a Decision-Dependent Ambiguity Set with Applications to Machine Scheduling and Humanitarian Logistics
1个月前
已完结
Exact Algorithms for Distributionallyβ-Robust Machine Scheduling with Uncertain Processing Times
1个月前
已完结
Multi-mode resource-constrained project scheduling problem with multiple shifts and dynamic energy prices
2个月前
已完结
A sustainable multi-objective multi-mode resource-constrained project scheduling problem solved by a new Reduced Bucket Search matheuristic algorithm
2个月前
已完结
Lower-limb movements prediction method based on adaptive temporal movement primitives for weight-loading exoskeletons
2个月前
已关闭
Exact Methods and a Two-Stage Iterative Heuristic for the Carrier-Vehicle Traveling Salesman Problem
3个月前
已完结
Optimizing an On-Demand Delivery Mode Based on Trucks and Drones
6个月前
已完结