Lv41
446 积分 2025-10-02 加入
Bicriteria scheduling on a single batching machine with job transportation and deterioration considerations
17分钟前
待确认
The multi-stage multi-product batch-sizing problem in the steel industry
19分钟前
已完结
Integrated Scheduling of Production and Two-Stage Delivery of Make-to-Order Products: Offline and Online Algorithms
30分钟前
已完结
A fast and elitist multiobjective genetic algorithm: NSGA-II
15天前
已完结
The optimization of warehouse location and resources distribution for emergency rescue under uncertainty
15天前
已完结
Location and Emergency Inventory Pre‐Positioning for Disaster Response Operations: Min‐Max Robust Model and a Case Study of Yushu Earthquake
15天前
已完结
Modeling Emergency Logistics Location-Allocation Problem with Uncertain Parameters
16天前
已完结
Dynamic Optimization of Emergency Logistics for Major Epidemic Considering Demand Urgency
16天前
已完结
Pre- and Post-Disaster Allocation Strategies of Relief Items in the Presence of Resilience
16天前
已完结
Integrated System Design for Post-Disaster Management: Multi-Facility, Multi-Period, and Bi-Objective Optimization Approach
16天前
已完结