Lv1
46 积分 2023-05-08 加入
A multi-objective simulated annealing approach to design ergonomic job rotation schedules: a case study in the automotive assembly line
23天前
已完结
The fuzzy human-robot collaboration assembly line balancing problem
1个月前
已完结
A Heuristic-Mixed Genetic Algorithm for Type II Multi-Manned Assembly Line Balancing with Multiple Workers in Workstations
1个月前
已关闭
An improved adaptive fuzzy-genetic algorithm based on local search for integrated production and mobile robot scheduling in job-shop flexible manufacturing system
1个月前
已完结
Production rate optimization through discrete-event simulation: A case study at pharmaceutical industry in Iraq
1个月前
已完结
A hybrid particle swarm optimization and simulated annealing algorithm for the job shop scheduling problem with transport resources
1个月前
已完结
Multi-objective simulated annealing-genetic hybrid algorithm for multi-manned U-shaped assembly lines with motion-based task durations
1个月前
已关闭
A Heuristic-Mixed Genetic Algorithm for Type II Assembly Line Balancing with Multiple Workers in Workstations
1个月前
已完结
Flexible job shop scheduling with stochastic machine breakdowns by an improved tuna swarm optimization algorithm
2个月前
已完结
Solving many-objective reentrant hybrid flowshop scheduling problem considering uncertainty factors in thin-film transistor liquid crystal display
3个月前
已完结