Lv1
20 积分 2022-09-28 加入
Multiobjective Trade-Off Optimization of Time, Cost, Quality, and Carbon Emission in the Building Construction Stage
5天前
已完结
A low-carbon resource-constrained project scheduling problem with limited three-dimensional workspaces and its hierarchical deep reinforcement learning approach
5天前
已关闭
Exact Methods and a Two-Stage Iterative Heuristic for the Carrier-Vehicle Traveling Salesman Problem
1个月前
已完结
Exact Methods and a Two-Stage Iterative Heuristic for the Carrier-Vehicle Traveling Salesman Problem
2个月前
已完结
The Oxford Handbook of Agent-based Computational Management Science
4个月前
已完结
Human-Centric Order Picking: Performance Prediction and Robot Assignment at a Robotic Fulfillment Center
6个月前
已完结
A machine learning-based genetic programming algorithm for the stochastic resource-constrained project scheduling problem with 3D workspaces and carbon emissions
6个月前
已完结
Resource-constrained project scheduling problem with hybrid energy and dynamic energy prices
7个月前
已完结
Multi-mode resource-constrained project scheduling problem with multiple shifts and dynamic energy prices
7个月前
已完结
A Project Scheduling Optimization Model for Reducing Construction Dust Emissions Based on Variability in Meteorological Conditions
8个月前
已完结