Lv1
30 积分 2025-12-27 加入
An adaptive large neighborhood search method for the AGV scheduling problem with a limited number of chargers
3个月前
已完结
Towards industry 5.0: A framework of reconfigurable matrix-structured manufacturing system
6个月前
已完结
Finding the right one: Decision support for selecting cost-efficient order picking solutions
6个月前
已关闭
Balancing parallel assembly lines with human-robot collaboration: problem definition, mathematical model and tabu search approach
7个月前
已完结
A Generalized Methodology for Well Island Generation and Well-tap Insertion in Analog/Mixed-signal Layouts
7个月前
已完结