Lv53
1090 积分 2025-09-16 加入
Multi-objective optimization for coordinated production and transportation in prefabricated construction with on-site lifting requirements
5天前
已完结
Integrated scheduling optimization of production and transportation for precast component with delivery time window
6天前
已完结
The effects of institutional pressures and resource conditions on low-carbon behaviors in the Prefabricated building supply chain: evidence from China
2个月前
已完结
Exploring the nexus of stakeholder management, project performance and stakeholder satisfaction in Malaysian residential building projects: a PLS-SEM approach
2个月前
已完结
Influencing factors and improvement strategies of supply chain resilience of prefabricated construction from the perspective of dynamic capabilities: the case of China
2个月前
已完结
An optimization model for just-in-time (JIT) delivery of precast components considering 3D loading constraints, real-time road conditions and assembly time
2个月前
已完结
Cost-Optimized Transport Planning for Prefabricated Modules with the Implementation of the Just-in-Time Strategy
2个月前
已完结
Just-in-Time Precast Production Scheduling Using Dominance Rule-Based Genetic Algorithm
2个月前
已完结
Multi-objective optimization for coordinated production and transportation in prefabricated construction with on-site lifting requirements
2个月前
已完结
Integrated scheduling optimization of production and transportation for precast component with delivery time window
2个月前
已完结