Lv4
600 积分 2024-04-26 加入
The Electric Vehicle-Routing Problem with Time Windows and Recharging Stations
12天前
已完结
A study on dynamic scheduling of AGV in ACTs with consideration of battery constraints
13天前
已完结
Integrated optimization of automated guided vehicles and yard cranes considering charging constraints
13天前
已完结
AGV scheduling in automated container terminals considering multi-load strategy and charging requirements
13天前
已完结
Integrated optimizing of double cantilever yard cranes scheduling and vehicle parking positions in U-shaped container terminal
20天前
已完结
An automated slot stowage optimization method for container ship based on improved Actor-Critic algorithm
21天前
已关闭
Integrated optimizing of double cantilever yard cranes scheduling and vehicle parking positions in U-shaped container terminal
21天前
已完结
Benchmark Suite for Industrial and Tramp Ship Routing and Scheduling Problems
1个月前
已完结
Hardness of Pricing Routes for Two-Stage Stochastic Vehicle Routing Problems with Scenarios
1个月前
已完结
Optimizing multiple equipment scheduling for U‐shaped automated container terminals considering loading and unloading operations
2个月前
已完结