Lv1
20 积分 2026-06-02 加入
Pollutant concentration prediction and demand-controlled ventilation driven by the STA-CNN-ResBiLSTM model in tunnel construction
8小时前
待确认
Optimal selection of a metro tunnel excavation method using AHP and TOPSIS: a case study of Tehran metro
8小时前
待确认
Application of Specific Drilling Energy for Rock Mass Characterization During Tunnel Construction
8小时前
已完结