Lv41
788 积分 2025-02-21 加入
TFT-MPIR: An end-to-end multi-period inventory replenishment strategy based on temporal fusion transformer
1小时前
待确认
Multiobjective Stochastic Optimization: A Case of Real-Time Matching in Ride-Sourcing Markets
22天前
已完结
Risk Aversion in a Data-Driven Multi-period Inventory Control Problem
27天前
已完结
A biogeography-based optimisation algorithm for a realistic no-wait hybrid flow shop with unrelated parallel machines to minimise mean tardiness
2个月前
已完结
A biogeography-based optimisation algorithm for a realistic no-wait hybrid flow shop with unrelated parallel machines to minimise mean tardiness
2个月前
已关闭
Scheduling and order acceptance for the customised stochastic lot scheduling problem
5个月前
已完结
Reinforcement Learning–Based Multiobjective and Multiconstraint Production Scheduling for Precast Concrete
5个月前
已完结
Large-Scale Dynamic Scheduling for Flexible Job-Shop With Random Arrivals of New Jobs by Hierarchical Reinforcement Learning
5个月前
已完结
Robust Satisficing
7个月前
已完结
Down to Earth: Implementing Project-Level ESG Metrics in Chinese AEC Firms’ Practices
7个月前
已完结