Lv41
758 积分 2025-02-21 加入
A biogeography-based optimisation algorithm for a realistic no-wait hybrid flow shop with unrelated parallel machines to minimise mean tardiness
19天前
已完结
A biogeography-based optimisation algorithm for a realistic no-wait hybrid flow shop with unrelated parallel machines to minimise mean tardiness
19天前
已关闭
Scheduling and order acceptance for the customised stochastic lot scheduling problem
3个月前
已完结
Reinforcement Learning–Based Multiobjective and Multiconstraint Production Scheduling for Precast Concrete
3个月前
已完结
Large-Scale Dynamic Scheduling for Flexible Job-Shop With Random Arrivals of New Jobs by Hierarchical Reinforcement Learning
3个月前
已完结
Robust Satisficing
5个月前
已完结
Down to Earth: Implementing Project-Level ESG Metrics in Chinese AEC Firms’ Practices
5个月前
已完结
Stochastic Project Scheduling Optimization for Multi-stage Prefabricated Building Construction with Reliability Application
5个月前
已完结
Component-level construction schedule optimization for hybrid concrete structures
5个月前
已完结
Production scheduling of off-site prefabricated construction components considering sequence dependent due dates
5个月前
已完结