Lv2
118 积分 2025-10-21 加入
An energy-efficient scheduling approach for a two-stage hybrid flow shop with parallel batch machines
1小时前
求助中
A new neighbourhood structure for job shop scheduling problems
11天前
已完结
Research on Flexible Job Shop Scheduling Optimization Based on Segmented AGV
1个月前
已完结
Research on Optimization of Dual-Resource Batch Scheduling in Flexible Job Shop
2个月前
已关闭
Research on Flexible Job Shop Scheduling Optimization Based on Segmented AGV
2个月前
已完结
A hybrid NSGA-II for energy-efficient flexible job shop scheduling problem with finite multi-load AGV resources
2个月前
已完结
Digital twin-based optimization of AGV scheduling under energy constraints in plant factories
3个月前
已完结
Collaborative algorithm of workpiece scheduling and AGV operation in flexible workshop
6个月前
已完结
Combining data-driven and model-driven methods to support digital-twin engineering design: A case study for the (Re)design optimization of a quadcopter
8个月前
已完结