Lv12
4 积分 2025-11-20 加入
Timing decision-making method of engine blades for predecisional remanufacturing based on reliability analysis
13分钟前
求助中
Maintenance best way for meeting the challenge of regeneration
1小时前
已完结
Timing Matching Method of Decision-Making in Predecisional Remanufacturing for Mechanical Products
2小时前
已完结
Robust Remanufacturing Planning with Parameter Uncertainty
2小时前
已完结
Proactive remanufacturing timing determination method based on residual strength
5天前
已完结
Performance evaluation and decision making for pre-decision remanufacturing timing with on-line monitoring
5天前
已完结
A systematic review of decision-making in remanufacturing
9天前
已完结
Product design for leased products under remanufacturing
9天前
已完结
Optimizing production and maintenance for the service-oriented manufacturing supply chain
9天前
已完结
Optimal production and maintenance strategies for manufacturing/remanufacturing leasing system considering uncertain quality and carbon emission
11天前
已完结
Pollution characteristics and health risks of size-resolved particulate-bound polycyclic aromatic compounds in Zhengzhou
5个月前
已采纳
Amplifying tumor recognition and drug susceptibility by multivalent ApDC assembly to combat with tumor cell heterogeneity
8个月前
已采纳
A chassis performance enhancement method for wheeled engineering vehicles: Road profile estimation and active suspension control
8个月前
已采纳
An effectively isolated chromophore with tetrapodal anionic pendants for hypoxia-triggered photothermal tumor therapy
8个月前
已采纳
Transcriptome-wide mRNP condensation precedes stress granule formation and excludes new mRNAs
8个月前
已采纳