Lv42
526 积分 2026-01-31 加入
Utilization-efficient computing strategy-enabled coordinative rescheduling approach of multi-workshop automobile manufacturing system with defective products
1小时前
求助中
Tackling dual-resource flexible job shop scheduling problem in the production line reconfiguration scenario: An efficient meta-heuristic with critical path-based neighborhood search
2小时前
已完结
Comparison of three particle swarm optimization algorithms for the simple assembly line balancing problem: a perspective of fitness landscape analysis
14天前
已完结
Integrated construction scheme and critical path search for scheduling with reentrant and skippable operations in real-world hybrid flowshop
20天前
已完结
Dynamic flexible job shop scheduling problem considering multiple types of dynamic events
1个月前
已完结
An efficient Q-learning integrated multi-objective hyper-heuristic approach for hybrid flow shop scheduling problems with lot streaming
1个月前
已完结
A hierarchical integration scheduling method for flexible job shop with green lot splitting
2个月前
已完结
A Population-Based Iterated Greedy Algorithm for Distributed Assembly No-Wait Flow-Shop Scheduling Problem
2个月前
已完结
Double deep Q-network based multi-objective optimization for flexible job shop scheduling problem with heterogeneous automatic guided vehicles
2个月前
已完结
A double deep Q-network-based memetic algorithm for distributed flexible job shop scheduling integrating after-sales distribution and maintenance
2个月前
已关闭