| 标题 |
Supply chain cost model for prefabricated building material based on time-driven activity-based costing |
| 网址 | |
| DOI | |
| 其它 |
期刊:Canadian Journal of Civil Engineering 作者:Yong-Woo Kim; Seung-Heon Han; June-Seong Yi; SooWon Chang 出版日期:2016-01-13 |
| 求助人 | |
| 下载 | 求助已完成,仅限求助人下载。 |
PDF的下载单位、IP信息已删除
(2025-6-4)