Chang-Yeon Cho,Jungyeol Kim,Moon-Young Cho,Junbok Lee,Young-Suk Kim,Soon‐Wook Kwon
出处
期刊:Proceedings of the ... ISARC
日期:2010-06-20
被引量:19
标识
DOI:10.22260/isarc2010/0003
摘要
Lifting indicates vertical transfer of construction resources.In high-rise building, efficient plan and management on lifting of resources are essential because of enormous impact on schedule, and amount of resources and data.In particular, a hoist-one of main lifting equipment for workers and construction materials-may have direct influence on overall project schedule depending on its number, location and operation method.To ensure efficient construction, it is critical to have an optimal hoist operating plan.Engineers depend on various empirical methods, which have been optimized through numerous feedbacks from construction projects.Therefore, it is necessary to optimize hoist plan and management based on both engineers' experiences and simulation based on actual data on lifting load and height.This paper describes a simulation method to provide data to an experienced engineer for accurate decision-making.
科研通智能强力驱动
Strongly Powered by AbleSci AI