孔力学
比奥数
结算(财务)
弯矩
振动
有限元法
岩土工程
结构工程
工程类
边值问题
地质学
机械
物理
声学
多孔性
万维网
付款
多孔介质
量子力学
计算机科学
作者
Li Shi,Jie He,Zhiguo Huang,Honglei Sun,Zonghao Yuan
标识
DOI:10.1016/j.soildyn.2022.107202
摘要
The influences of the tunnel settlement on vibrations of the saturated poroelastic ground and on the additional forces of the tunnel lining are investigated numerically in this paper. A three-dimensional finite element model incorporating the metro train, the tunnel lining and the saturated ground has been established. The ground settlement is introduced into the computational model by a specifically developed vehicle-rail interaction (VRI) element, through which the metro train can be dynamically coupled to the track. The ground is considered as a saturated poroelastic medium that is discretized by a self-developed saturated-soil element based on Biot's theory. Moreover, at truncation boundaries of the ground model, an absorbing boundary condition termed multi-transmitting formula (MTF) that is specially developed for the saturated soil element is applied to meet the far-filed radiation condition. With the inputs of ground settlement data from in-situ measurement, amplifications in the ground vibration and the lining forces have been quantitatively determined by comparing to the settlement-free case. It is found that the ground vibrational velocity and acceleration can reach 40–60 times the responses when there is no differential settlement of the tunnel; the dynamic internal forces including the axial force, the shear force and the bending moment of the tunnel lining can be 7–20 times higher than their static counterparts.
科研通智能强力驱动
Strongly Powered by AbleSci AI